Development on Reliance Petroleum’s (now often called Reliance Industries) refinery and petrochemical complex in Jamnagar, Gujarat, India, was began in December 2005. The Jamnagar complex, stated to be some of the superior in the world, grew to become operational in December 2008.
The refinery has a capacity of 580,000bpd and a polypropylene (PP) plant has a capability of 900,000tpa. The PP plant is positioned adjoining to the Jamnagar Integrated Petrochemical Complex, in Gujarat. The PP is produced using propylene feedstock from the refinery advanced.
In February 2012, one of the crude distillation units of the refinery was shutdown for a planned maintenance turnaround. Mild cycle oil hydrocracker and vacuum gasoline oil hydrotreating items were shutdown in September 2011 for upkeep and inspection.
Financing the Jamnagar polypropylene complex
The refinery and PP plant required an funding of $6bn. Throughout the primary half of 2006 RPL accomplished the fairness financing of the mission via an preliminary public offering syndicated foreign forex loan amenities. The Export Import Bank of the United States offered a $500m loan assure.
Refinery and petrochemical facility mission management
Project management, procurement and engineering providers for RPL’s PP plant had been supplied by Aker Kvaerner, who won the contract in August 2007. The power comprises two PP lines each with a capacity of 450,000tpa. The value of the contract was not disclosed.
Fundamental contractors linked to Reliance Petroleum’s PP plant
Aker Kvaerner’s AK Course of business offered the basic engineering and venture administration on the PP facility. Aker Kvaerner Powergas, primarily based in Mumbai, India, provided the detailed design and engineering providers.
Petron Engineering was contracted in April 2007 to provide mechanical works for line one of the PP plant.
PP process tools supplied to the power in Gujarat
Dow Global Technologies, a subsidiary of Dow Chemicals, was chosen to provide its Unipol process know-how for the PP facility.
The PP course of all gasoline-part expertise is based on a fluidised mattress reactor system. The stable and predictable system is designed to have less movable gear.
The method consists of purification, response, purging, vent restoration, additives and pelleting.
The mechanical operations of the technology are easy and require much less major tools. The reactors are used to produce homopolymers and other copolymers. The method uses the identical gasoline phase fluidised mattress within the copolymer response state.
Provide of compression and valve expertise by GE
Through the second half of 2007, the oil and gasoline enterprise of GE introduced that is had been given a contract to supply compression expertise for the refinery and PP plant at Jamnagar. GE equipped three reciprocating compressors, which were manufactured by GE’s oil and gas services in Florence, Italy, along with two screw compressors.
Metso Automation, a worldwide engineering and expertise company, headquartered in Helsinki, Finland, was awarded the contract to supply valves and actuators for RPL’s PP plant.
Reliance Petroleum / RIL and background to its Indian plant project
The brand new refinery complicated is situated adjoining to RIL’s present refinery and petrochemical complicated. RIL already has PP capability on the Jamnagar site, along with capability at another site in Hazira, India.
RPL, the former RIL subsidiary which built the complex, was set-up to harness value in the global refining sector. RPL was merged with RIL in 2009. The Jamnagar petrochemical advanced noticed main capability expansions in polypropylene and paraxylene by 2008.
The refining plant alone has a capacity of 27 million tpa, which has elevated to 108% of the working rates since April 2000. The entire advanced is unfold over 31 square kilometres.